Product Details:
|
GS12000-TS horizontal directional drilling machine, 1200ton horizontal directional drilling machine, 1200ton hdd machine, 1200ton hdd rig, goodeng hdd machine 1200ton, goodeng hdd rig 1200ton,
1. LNG pipeline in BinHai, Jiangsu province
Bid section III Directional Drilling Project
on January 6, 2022,Goodeng GS10000-L Large drilling rig helps the Sanhe directional drilling crossing project of Jiangsu Binhai LNG gas transmission pipeline crossing successfully, which lasted 72 hours. The project adopts the joint crossing mode of double drilling rigs, with a total length of 2141m.
Construction difficulties:Large pipe diameter, deep drilling, complex geology and long distance
1. The stratum environment is complex and the geology is soft.
Project Name:Sanhe directional drilling crossing project of Jiangsu Binhai LNG gas transmission pipeline crossing
Construction site:Sanhe Town, Huai'an City, Jiangsu Province
Geological Conditions:Silty clay, silt and fine sand
Material and specification of Main Pipe:DN914mm+DN114
Length of Main Pipe:2141m
Construction Equipment: GS10000-L, GD3500-L
Pull pipe:From 2022.1.6 to 2022,1,9,total 72hours!
Project Name:Shangxi Shenmu-Anping Gas pipeline Project Construction Equipment:GS12000C-L
Geological Conditions:Powdered clay
Pullback Pipe Diameter&Project Length:Φ813mm×1670m Start & Finish Times of Project:2021.9.9-10.29
Contact Person: Ms. Alice Cai
Tel: 86-18752825001